Catch the overrun while there’s still room to move.
Every capital project and major repair is kept in Insights, from 1.0 Initial Requisition to 8.0 Complete: its budget built line by line and formalized onto the project, its billing and inspection reports, and a history of who changed what. The period’s Capital Budget and Long Term Plan read from the same projects — and when one runs over, the Scorecard says so.
| Open project · health | Budget | Billed |
|---|---|---|
| Mechanical retrofit 6.0 Construction Red | $1.40M | $1.52M |
| Lobby refresh 6.0 Construction Yellow | $0.32M | $0.28M |
| Garage sealant & drainage 4.0 Capital Budget Green | $0.30M | $0.00M |
| Roof membrane, west 3.0 Capital Plan Green | — | — |
From requisition to handover — and the overrun called out.
Every project carries its stage, budget, billing and history in Insights, all year. When one moves, the period’s report picks it up at the next CapEx close, the Scorecard knows, and nobody rebuilds the tracker before the meeting.
Kept in Insights
Capital Projects and Major Repairs on every property and asset group. The Summary leads with what needs attention — health red, past construction end, billed over the current budget — and the lists group by the year construction starts.
Eight stages, recorded
1.0 Initial Requisition to 8.0 Complete. Forward a stage records the budget, dates and fees as the project enters each one, so the plan figure and the approved budget both stay on file.
Budget allocations, then formalize
Build the budget line by line, with schedules, snapshots, compare and templates. Formalize budget change moves the figures onto the project — it takes Approve, and formalizing is the approval.
Billing and inspections
Invoices and inspection reports make Billings to Date, Cost to Complete, Work Completed and the Variance — red past your limit. Every project keeps a History of who changed what.
Import, even mid-flight
Load projects and billing from CSV or Excel, previewed row by row — including projects already under way, with their billing to date. A blank cell never clears what’s on file.
Red flags with evidence
CapEx deferred and Completed projects over budget feed the Capital area of the Asset Scorecard, and CapEx Projects Over Budget puts every overrun in the book on Home.
Forward a stage, and the record keeps up.
Click a project to open it beside the list, its stages across the top. Forward a stage moves it on and records its budget, dates and fees in that stage’s column under Financial details and schedule. Reaching 4.0 sets the capital budget and marks the project budgeted; one that isn’t budgeted goes from 2.0 straight to 5.0. Reaching 8.0 completes it, and Re-open brings it back to 7.0.
- What can’t be typed: the current budget, change orders and fees move only by formalizing, and Total Spent only through billing.
- Once construction begins a project can’t go back; at 7.0 and 8.0 it can step back one stage to correct a move.
- A project with billings, or one that reached construction, is cancelled rather than deleted, so its record stays.
- An Account Code ties a project to your accounting or job cost system; no two projects share one.
| Recorded at | Budget | Dates | Fees |
|---|---|---|---|
| 3.0 Capital Plan | $1.20M | 2026 | — |
| 4.0 Capital Budget | $1.40M | Apr–Dec 2026 | $0.07M |
| 5.0 Final Review | $1.40M | Apr–Dec 2026 | $0.07M |
| 6.0 Construction | $1.40M | Apr 13 start | $0.07M |
Build the budget line by line. Formalize when it’s right.
A project’s Budget allocations tab is where its budget is built: New budget line adds one, each with a schedule by year and month or a breakdown. Snapshots keep a copy to compare or go back to, Compare sets two side by side with a PDF to download, and Templates save a budget for others to start from. Nothing reaches the project until someone with approval chooses Formalize budget change — which moves the construction budget, amortization amount, management fees and change orders onto it.
- Formalizing takes Approve on the Projects process and on the property, and formalizing is the approval.
- A line closed at the project’s current stage shows Locked.
- When Formalize can’t be used, the button says why.
| Budget line | Amount | This year |
|---|---|---|
| Chiller replacement Locked | $860,000 | $860,000 |
| Air handlers (2) | $380,000 | $380,000 |
| Controls & commissioning | $160,000 | $90,000 |
| Change order — scope after chiller survey New | $250,000 | $250,000 |
| Working budget | $1,650,000 | $1,580,000 |
Billed, inspected — and what’s left to complete.
New billing records an invoice against the project — amount, date, invoice and vendor numbers, notes — and New inspection report the share of the work completed. Together they make Billings to Date, Cost to Complete, Work Completed and the Variance at the top, which turns red past your environment’s limit. Import a contractor’s invoices or payment certificates from a file and they go in oldest first, as if typed.
- A capital project carries its Amortization schedule; History lists who changed what and when, with the money changes on their own.
- A billing on file is never changed by an import, and only the newest entry’s amount can be edited.
- Generate report makes the capital project summary — budget, spend, billing and changes — and CapEx’s Reports tab the capital plan summary, both by WordMerge.
| Entry | Date | Amount |
|---|---|---|
| Invoice #4471 · Lakeshore Mechanical | 2026-10-01 | $310,000 |
| Inspection report · work completed | 2026-10-01 | 82% |
| Invoice #4398 · Lakeshore Mechanical | 2026-09-02 | $420,000 |
| Payment certificate 3 | 2026-08-03 | $390,000 |
Bring the plan in. See every property at once.
Import on Capital Projects or Major Repairs, or on the CapEx page across every property, loads projects from a CSV or Excel file whose columns are named as the project form names them. You see every row before anything is saved. A project on file is found by its Account Code, else its name and the year it starts. Projects already under way can come in at their own stage, up to 8.0 Complete, with their billing to date as a second file. Or skip the file: hand the capital plan, a building condition assessment or the contractors’ invoices to the AI assistant you already use, and it loads them through the same import — previewed first, saved when you say so.
- A project several buildings share is filed on its asset group, each building counting its share, starting from their floor areas.
- CapEx on the left rail covers every property you can open: what needs attention, all the projects and a line for each property.
- On the Long Term Plan, click a Job Name to open its project; the breakdown ends with a total.
| Row | Project | What happens |
|---|---|---|
| 2 | Parking deck resurfacing Crown Plaza | Added at 3.0 |
| 3 | Roof replacement, phase 1 Maple Centre | Under way · to 6.0 |
| 4 | Lobby refresh Westbridge Tower | Account Code · 1 blank filled |
| 5 | Elevator modernization Harbour Pointe | Refused · no construction start |
This year’s spend, and the years queued behind it.
Overview → CapEx shows the period’s report. The Capital Budget holds this year: each category’s budget against actual, with commentary on the projects driving it. The Long Term Plan holds what comes after — so when the west roof membrane slips a year, you see it land in 2027 rather than drop out of the conversation. A change to a project reaches them the next time CapEx is closed or refreshed for the period.
- Commentary for Recoverable, Non-Recoverable, Unbudgeted and Prior Year projects, plus Major Repairs and Capital Project Initiatives.
- Completed projects over budget — completed projects, taken together, cost more than their approved budgets.
- CapEx deferred — capital spend well under plan; high severity when it’s a building system, such as a roof.
| Category · commentary | Budget | Actual YTD |
|---|---|---|
| Recoverable Draft | $1.70M | $1.53M |
| Non-Recoverable Complete | $0.32M | $0.28M |
| Major Repairs In review | $0.88M | $0.50M |
| Unbudgeted None | $0.00M | $0.00M |
| Year | Plan amount | Job Name |
|---|---|---|
| 2026 | $2.90M | Mechanical retrofit, elevator ph. 1, lobby, garage sealant |
| 2027 | $2.46M | Elevator ph. 2 · roof membrane, west Deferred from 2026 |
| 2028 | $1.35M | Window sealant, west elevation |
| 2029 | $0.90M | Parking deck resurfacing |
| 2030 | $2.20M | Cooling tower replacement |
| Total | $9.81M |
Ask across the book — or hand it the file.
Insights AI reads the capital budget, every project’s reforecast and cost to complete, and the commentary your team has written — and the projects themselves, across every property you can open, so “every roof project across the book” is one answer. AI tools connected to Insights can load projects, billings or a project’s budget lines from a file you hand them, shown to you first, where your administrator lets agents make changes.
- Across every property — stage, health, budget and billing, cited, in one answer.
- From your files — a capital plan, contractors’ invoices, a budget — previewed before anything saves.
- Never formalizes — a project’s budget moves only when someone with approval formalizes it.
Where capital goes next.
See a project from requisition to handover.
A 30-minute walkthrough: a project moving through its stages, a budget formalized, billing against it, and the overrun it raises on the Scorecard.