Catch the overrun while there’s still room to move.

Every capital project and major repair is kept in Insights, from 1.0 Initial Requisition to 8.0 Complete: its budget built line by line and formalized onto the project, its billing and inspection reports, and a history of who changed what. The period’s Capital Budget and Long Term Plan read from the same projects — and when one runs over, the Scorecard says so.

Insights · Westbridge Tower · CapEx
Westbridge Tower / CapEx Ask Insights
SummaryCapital ProjectsMajor RepairsReports
CapEx · Summary · October 2026 Needs attention — 2 of 4 open projects 1 billed over its current budget · 1 past its construction end
Mechanical retrofit — billed over its current budget
$1.52M billed against $1.40M · health Red · 6.0 Construction
Over budget
Lobby refresh — past its construction end
Construction end Sep 30, 2026 · still at 6.0 Construction
Past end
Open project · healthBudgetBilled
Mechanical retrofit
6.0 Construction Red
$1.40M$1.52M
Lobby refresh
6.0 Construction Yellow
$0.32M$0.28M
Garage sealant & drainage
4.0 Capital Budget Green
$0.30M$0.00M
Roof membrane, west
3.0 Capital Plan Green
——
What it does

From requisition to handover — and the overrun called out.

Every project carries its stage, budget, billing and history in Insights, all year. When one moves, the period’s report picks it up at the next CapEx close, the Scorecard knows, and nobody rebuilds the tracker before the meeting.

Kept in Insights

Capital Projects and Major Repairs on every property and asset group. The Summary leads with what needs attention — health red, past construction end, billed over the current budget — and the lists group by the year construction starts.

Eight stages, recorded

1.0 Initial Requisition to 8.0 Complete. Forward a stage records the budget, dates and fees as the project enters each one, so the plan figure and the approved budget both stay on file.

Budget allocations, then formalize

Build the budget line by line, with schedules, snapshots, compare and templates. Formalize budget change moves the figures onto the project — it takes Approve, and formalizing is the approval.

Billing and inspections

Invoices and inspection reports make Billings to Date, Cost to Complete, Work Completed and the Variance — red past your limit. Every project keeps a History of who changed what.

Import, even mid-flight

Load projects and billing from CSV or Excel, previewed row by row — including projects already under way, with their billing to date. A blank cell never clears what’s on file.

Red flags with evidence

CapEx deferred and Completed projects over budget feed the Capital area of the Asset Scorecard, and CapEx Projects Over Budget puts every overrun in the book on Home.

Working on a project

Forward a stage, and the record keeps up.

Click a project to open it beside the list, its stages across the top. Forward a stage moves it on and records its budget, dates and fees in that stage’s column under Financial details and schedule. Reaching 4.0 sets the capital budget and marks the project budgeted; one that isn’t budgeted goes from 2.0 straight to 5.0. Reaching 8.0 completes it, and Re-open brings it back to 7.0.

  • What can’t be typed: the current budget, change orders and fees move only by formalizing, and Total Spent only through billing.
  • Once construction begins a project can’t go back; at 7.0 and 8.0 it can step back one stage to correct a move.
  • A project with billings, or one that reached construction, is cancelled rather than deleted, so its record stays.
  • An Account Code ties a project to your accounting or job cost system; no two projects share one.
Westbridge Tower · CapEx · Mechanical retrofit
1.02.03.04.05.06.0 Construction7.08.0
Financial details and schedule
Recorded atBudgetDatesFees
3.0 Capital Plan$1.20M2026—
4.0 Capital Budget$1.40MApr–Dec 2026$0.07M
5.0 Final Review$1.40MApr–Dec 2026$0.07M
6.0 Construction$1.40MApr 13 start$0.07M
History · Maria Lin · Apr 13
Forward a stage — 5.0 Final Review to 6.0 Construction. Budget, dates and fees recorded at 6.0.
Budget allocations

Build the budget line by line. Formalize when it’s right.

A project’s Budget allocations tab is where its budget is built: New budget line adds one, each with a schedule by year and month or a breakdown. Snapshots keep a copy to compare or go back to, Compare sets two side by side with a PDF to download, and Templates save a budget for others to start from. Nothing reaches the project until someone with approval chooses Formalize budget change — which moves the construction budget, amortization amount, management fees and change orders onto it.

  • Formalizing takes Approve on the Projects process and on the property, and formalizing is the approval.
  • A line closed at the project’s current stage shows Locked.
  • When Formalize can’t be used, the button says why.
Mechanical retrofit · Budget allocations
Budget lineAmountThis year
Chiller replacement Locked$860,000$860,000
Air handlers (2)$380,000$380,000
Controls & commissioning$160,000$90,000
Change order — scope after chiller survey New$250,000$250,000
Working budget$1,650,000$1,580,000
Snapshot · Approved budget, Apr 2026$1.40MKept
Compare · snapshot vs working+$0.25MPDF
Formalize budget change · needs Approve
Moves $1.65M, the fees and the change order onto the project. Waiting for J. Moreno.
Billing and inspections

Billed, inspected — and what’s left to complete.

New billing records an invoice against the project — amount, date, invoice and vendor numbers, notes — and New inspection report the share of the work completed. Together they make Billings to Date, Cost to Complete, Work Completed and the Variance at the top, which turns red past your environment’s limit. Import a contractor’s invoices or payment certificates from a file and they go in oldest first, as if typed.

  • A capital project carries its Amortization schedule; History lists who changed what and when, with the money changes on their own.
  • A billing on file is never changed by an import, and only the newest entry’s amount can be edited.
  • Generate report makes the capital project summary — budget, spend, billing and changes — and CapEx’s Reports tab the capital plan summary, both by WordMerge.
Mechanical retrofit · Billing and inspections
Billings to date
$1.52M
vs $1.40M budget
Work completed
82%
Oct 1 report
Cost to complete
$0.33M
at 82%
Variance
+$0.12M
past your limit
EntryDateAmount
Invoice #4471 · Lakeshore Mechanical2026-10-01$310,000
Inspection report · work completed2026-10-0182%
Invoice #4398 · Lakeshore Mechanical2026-09-02$420,000
Payment certificate 32026-08-03$390,000
History · Pat Lee · Oct 2
Billing added from September invoices.xlsx: Invoice #4471, $310,000. Total Spent is now what the entries add up to.
Imports and every property

Bring the plan in. See every property at once.

Import on Capital Projects or Major Repairs, or on the CapEx page across every property, loads projects from a CSV or Excel file whose columns are named as the project form names them. You see every row before anything is saved. A project on file is found by its Account Code, else its name and the year it starts. Projects already under way can come in at their own stage, up to 8.0 Complete, with their billing to date as a second file. Or skip the file: hand the capital plan, a building condition assessment or the contractors’ invoices to the AI assistant you already use, and it loads them through the same import — previewed first, saved when you say so.

  • A project several buildings share is filed on its asset group, each building counting its share, starting from their floor areas.
  • CapEx on the left rail covers every property you can open: what needs attention, all the projects and a line for each property.
  • On the Long Term Plan, click a Job Name to open its project; the breakdown ends with a total.
CapEx · every property · Import · Preview
RowProjectWhat happens
2Parking deck resurfacing
Crown Plaza
Added at 3.0
3Roof replacement, phase 1
Maple Centre
Under way · to 6.0
4Lobby refresh
Westbridge Tower
Account Code · 1 blank filled
5Elevator modernization
Harbour Pointe
Refused · no construction start
Billing to date · second file14 entriesReady
Values on file replaced0Replace off
Capital Budget and Long Term Plan

This year’s spend, and the years queued behind it.

Overview → CapEx shows the period’s report. The Capital Budget holds this year: each category’s budget against actual, with commentary on the projects driving it. The Long Term Plan holds what comes after — so when the west roof membrane slips a year, you see it land in 2027 rather than drop out of the conversation. A change to a project reaches them the next time CapEx is closed or refreshed for the period.

  • Commentary for Recoverable, Non-Recoverable, Unbudgeted and Prior Year projects, plus Major Repairs and Capital Project Initiatives.
  • Completed projects over budget — completed projects, taken together, cost more than their approved budgets.
  • CapEx deferred — capital spend well under plan; high severity when it’s a building system, such as a roof.
Westbridge Tower · Overview · CapEx · FY2026
Budget
$2.90M
FY2026
Actual YTD
$2.31M
+18% vs YTD
Completed
1
under budget
Over budget
1
+$0.12M
Category · commentaryBudgetActual YTD
Recoverable
Draft
$1.70M$1.53M
Non-Recoverable
Complete
$0.32M$0.28M
Major Repairs
In review
$0.88M$0.50M
Unbudgeted
None
$0.00M$0.00M
Commentary · Recoverable · Pat Lee · Draft
Mechanical retrofit has billed $1.52M against its $1.40M budget after the chiller survey expanded the scope to both air handlers. A $0.25M change order is with J. Moreno to formalize; completion moves to February 2027.
Insights AI in capital projects

Ask across the book — or hand it the file.

Insights AI reads the capital budget, every project’s reforecast and cost to complete, and the commentary your team has written — and the projects themselves, across every property you can open, so “every roof project across the book” is one answer. AI tools connected to Insights can load projects, billings or a project’s budget lines from a file you hand them, shown to you first, where your administrator lets agents make changes.

  • Across every property — stage, health, budget and billing, cited, in one answer.
  • From your files — a capital plan, contractors’ invoices, a budget — previewed before anything saves.
  • Never formalizes — a project’s budget moves only when someone with approval formalizes it.
Your AI · Insights MCP · Northgate REIT
Which roof projects do we have across the book, and where do they stand?
Reading capital projects · “roof” · every property you can open
Your AI
Three. Maple Centre — Roof replacement, phase 1, at 6.0 Construction, $0.98M billed of a $1.25M budget CapEx · Maple Centre. Westbridge Tower — Roof membrane, west, at 3.0 Capital Plan, planned for 2027 CapEx · Westbridge Tower. Northpoint Industrial — Roof replacement, 8.0 Complete in June, 3% under budget CapEx · Northpoint Industrial.
Here are the roofer’s October invoices for Maple Centre. Add them.
Filing billings · preview · 2 entries
Your AI
Two invoices, $186,400 in all, neither on file. They’d go in oldest first, and Total Spent would become $1.17M Invoices · p. 1–2. Add them?
Add 2 billingsEdit first