Lock the numbers, write the story, publish the record.
Each period Insights opens a report for every asset that owes one. Your team locks each module’s figures on the Close Process board, writes the commentary section by section and sends it for approval — then Publish freezes it as the period’s record. No spreadsheets passed around, no PDF stitched together the night before the owner meeting.
One close, from first figure to final record.
The figures, the commentary, the sign-off and the owner’s pack live on the same report — so the number in the narrative is the number that was locked.
Lock each module when it’s final
Financials, Arrears and Leases close with month-end. Occupancy, CapEx, Valuations, Debt, ESG and Metrics close when their owner calls them final. A section opens for commentary once its figures are locked.
Commentary, section by section
Seven report groups — Property, Financial, Operational, Capital Projects, Accounts Receivable, Leasing and Sustainability. Every section has a writer, an approver and a due date on Deadlines.
Approval with a trail
Submit for review, Send back with a note, or Approve all in one pass. Where you’d rather skip the approver, Mark complete finishes a section in one step — set per environment, portfolio or asset.
Numbers changed — review
Close a module again with different figures and every section written against the old ones says so. The commentary stays editable; re-saving it clears the notice.
Publish, with a completeness check
Publish checks every required section, locks the report as the period’s record and freezes its Scorecard. Missed something? Unpublish reopens it.
Documents and packages
Insights’ own period-end report for an asset, an asset group or a portfolio — or yours, built in WordMerge Studio — as Word, PDF or both. Package it with the supporting reports, then mark the final copy official.
See every section, on every asset, by status.
Commentary Progress lays the period out as sections against assets. Writers submit; approvers clear what’s ready with Approve all and send back what needs another pass. Due dates sit on Deadlines, so a late section is visible before it’s late for the owner. When it’s all in, Publish runs its completeness check, locks the record and freezes the Scorecard.
- Submit for review, Send back, Approve all (N) — the whole sign-off in three buttons.
- “Numbers changed — review” when a locked module is closed again with different figures, and editors are told.
- Sum checks compare the totals your source systems send with the CapEx and arrears lines beneath them, and flag any that don’t add up.
- Published means published: the period’s record and its Scorecard stop moving. Unpublish if you must reopen it.
From commentary to the official copy, in one place.
Period Reporting sits under Planning & Operations on every asset, asset group and portfolio, in three steps: Commentary, Meetings and Report. The Report step follows the period’s report through the commentary, publishing, the final report and its official copy — and names the next step, so nobody has to ask.
- The period’s review meetings show under the steps, before or after the official copy.
- The reports and packages made from the period’s report are listed right there: generate, package and Mark official without leaving the page.
- The Planning & Operations Summary says where the report stands and what comes next, with the last published report beside it while the new one is under way.
| Made from this report | Status |
|---|---|
| Northgate REIT - 2026-09 · Word, PDF | Final |
| Northgate REIT - 2026-09.zip · package | Kept |
| Northgate REIT - 2026-09 (DRAFT) · 2 drafts | Delete drafts |
The owner’s pack, built from the record.
Generate the period-end report from Insights’ own templates — for an asset, an asset group or a portfolio, plus an asset’s two-page summary — or from templates you design in WordMerge Studio: Word, PDF or both. Then Package gathers it with the period’s supporting reports: a ZIP of originals, or one combined PDF, with a linked contents page if you want one. You set the standard supporting reports once; each period the package shows what it carries and flags what hasn’t been filed.
- Drag supporting reports into the order they go out — as a standing order, or for one package. The report always comes first.
- Every package is kept with its report, so anyone who can open the report can download it again from Documents.
- Generated before Publish, a document is marked draft; once the final version is generated, the drafts can be deleted in one step.
- Mark official keeps the final copy for good, and Official only finds it again under Documents.
- Portfolios and asset groups get their own commentary, their own close and their own package.
| Order | Document | Pages | Package |
|---|---|---|---|
| 1 | Period-end report · Sep 2026 | 24 | Included |
| 2 | Asset summary · two pages | 2 | Included |
| 3 | Rent roll · as of Sep 30 | 9 | Included |
| 4 | AR aging · as of Sep 30 | 4 | Included |
| 5 | Utility summary · Q3 | — | Missing — file it |
Take the whole book through close at once.
Run close asks one question — how far do you want to take the period? — and answers it for every asset in the run: lock this module group, save draft figures for that one, skip the rest. Switch on Insights AI and it drafts recommended commentary for what you lock. Each area waits for its own figures, and the executive summary waits for all of them, so a draft never describes a number that hasn’t arrived.
- Accounting modules carry what your accounting system posts at month-end; operator modules are finalized in Insights. Refresh or unlock any module before Publish.
- Drafts land above each comment — summary, recommendation, suggested actions — for the writer to edit and accept.
- Every figure in a draft is cited and checked before Accept. Nothing reaches the commentary until someone accepts it.
Drafts that show where every number came from.
Insights AI drafts commentary during Run close, beside the editor through Insights AI Assist, or on demand with Redraft commentary… in Standard, Deep or Hybrid mode. Every figure it quotes is cited — “Show where these figures came from” opens the source — and checked before you accept. Ask where the close stands and it reads the board for you.
- Cited, then checked — a figure that doesn’t tie out is flagged before you accept the draft.
- Your voice — admins set it: manager-to-owner by default, owner reviewing manager, or owner-operator.
- Your AI, too — the same close status and commentary over MCP; agents write commentary only once an admin allows it.
Everything closes with the period.
Not just the financials. Every module closes with the period — leases and occupancy, arrears, capital projects, valuations and debt, ESG, metrics and the actions on the register. The close takes a snapshot of every register, locks it, and makes it the record the commentary is written against and the report is built from.
- One frozen snapshot per period. Every figure in the commentary is the figure that was locked, and Publish keeps it that way.
- At every level. Properties, asset groups and portfolios each close, comment and publish on the same clock.
- Trends you can trust. Because every period is frozen, any period compares cleanly with the last — NOI, occupancy, arrears, capital spend or a Scorecard tier — for a property, a group or the whole book.
- Ask across periods. Insights AI and the AI your team connects read the same snapshots, so “how has arrears moved this year?” gets an answer from locked figures, not live ones.
| Register | Property | Group | Portfolio |
|---|---|---|---|
| Financials | Locked | Locked | Roll-up |
| Leases & occupancy | Locked | Assets | Roll-up |
| Arrears | Locked | Assets | Roll-up |
| Capital projects | Locked | Locked | Roll-up |
| Valuations | Locked | Assets | Roll-up |
| Debt | Locked | Assets | Assets |
| ESG | Locked | Locked | Roll-up |
| Metrics & KPI targets | Locked | Assets | Assets |
| Actions on the register | Locked | Locked | Locked |
Where the snapshot goes next.
See a period close, end to end.
A 30-minute walkthrough: the Close Process board, a section going from draft to approved, Publish, and the package your owner receives.