Platform/Asset performance
Occupancy Planning

Know where occupancy will land — this year and every year after.

Model renewals, expiries and lease-up as assumption scenarios, and Insights recalculates where occupancy and base rent will be at the end of this year and every year of the plan — from the leases you have and the assumptions you’ve made. Every unit sits on one Gantt, budget on top and actual and forecast underneath, so you see the gap still to fill while there’s time to fill it.

Used byAsset ManagersLeasing Managers
Insights · Westbridge Tower · Occupancy Planning
Westbridge Tower / Occupancy Planning Ask Insights
Assumption scenario · Active FY2026 Reforecast — Q3 Recalculated Oct 14 · against the finalized FY2026 Budget
Occupancy today
94.2%
−2.3 pts
Forecast YE 2026
92.5%
−0.5 vs budget
Forecast YE 2027
95.1%
+2.6 pts
Gap to fill
16,600 sf
2 units
JFMAMJJASOND
0301 Budget
Northwind Labs · renews Dec 1
0301 Act/Fcst
Northwind Labs · expires Nov 30
0701 Budget
Lease-up Jul 1 · 9,600 sf
0701 Act/Fcst
Vacant · lease-up now Q1 2027
0804 Budget
Cedar & Pine · renews May 1
0804 Act/Fcst
Cedar & PineRenewed to 2031
BudgetActual / forecastRenewalVacant
What it does

The leasing plan, unit by unit, against the budget.

Not a list of expiries someone rebuilds every quarter. Every unit carries the budget’s assumption and the live forecast side by side — so the gap has suite numbers attached.

Budget and forecast, per unit

A Gantt with two rows for every unit: BUDGET, as it was finalized, and ACTUAL / FORECAST, as it stands. Gap to fill totals the square footage between them.

Assumption scenarios

Model renewals, expiries and lease-up as named scenarios. Start from another scenario instead of a blank page, and make active the one the asset reports against.

Recalculate in one step

Change an assumption and Recalculate: Insights recomputes occupancy and the forecast from your lease data, with the same rules your budget was built on.

Finalize, then reforecast

Finalize locks the budget scenario. From then on you reforecast against it, never over it — so the variance in December is still measured from the number you agreed.

Tenancy at any date

A live Stacking Plan, Unit Listing and Lease Listing — the rent roll — opening as at the last day of the period you’re reading, with an as-of date you can move and Export. Industrial assets get a Bay Plan.

The Leasing tab

Performance, Net Activity, Net Absorption, Vacancies, Expiries budget against actual, and Base Rent by unit and month — plus Rollover for industrial. The leasing story, already counted.

Assumption scenarios

Track the plan you bought it on, not just this year’s budget.

A scenario is a named set of assumptions — which leases renew, which expire, when vacant space leases up — over as many years as you plan. Use them for what-ifs, and to keep the plans you’re held to: the investment assumptions you underwrote at acquisition over ten years, each year’s budget, and the latest reforecast, side by side. Finalize locks a scenario as a read-only snapshot, so actual is measured against every plan, not only the newest one. This year can land close to budget and still sit well off the underwriting — Insights shows you both.

  • Compare against any plan — the budget-against-actual view switches between scenarios, so the same months read against this year’s budget or the acquisition case.
  • Make active chooses the scenario the asset reports against; Recalculate recomputes occupancy and the forecast from it.
  • Finalize locks a scenario’s budget; from then on, you reforecast against it.
  • Start from any scenario — next year’s budget begins from this year’s reforecast.
  • Nothing goes missing — a projected lease the timeline can’t draw, or one a newly signed lease now overlaps, is listed above the chart to confirm or fix before you Recalculate or Finalize.
  • The plan behind each lease — the expiry decision and its probability are set here, and show on each lease in Property Profile & Leasing, where the team works the renewal and notice, the deal and the insurance certificate.
Westbridge Tower · Assumption scenarios
ScenarioStatus2026 YE occ.
Acquisition underwriting
2024–2033 · investment case
Finalized97.0%
FY2026 Budget
from the FY2025 reforecast
Finalized93.0%
FY2026 Reforecast — Q3Active92.5%
Q3 upside
Northwind renews
Draft94.2%
2026 base rent · actual to Sep 30, forecast after
Against the FY2026 Budget−1.2%On plan
Against the acquisition underwriting−9.8%Off the case
Recalculated · J. Moreno · Oct 14
Close to this year’s budget, but nearly 10% short of the rent the asset was bought on — the conversation to have at the next review.
Budget against actual

Click a year. Every unit against the budget, month by month.

Click a year on the timeline and Occupancy Planning opens its twelve months unit by unit: what the budget assumed beside actual and forecast. Read it in leased area, in base rent, or in base rent per square foot — as the budget, as actual and forecast, or as the variance — with the property’s leased area and occupancy totalled at the bottom and its average rate under the rent totals.

  • Leased Area, Base Rent and Base Rent / Sq Ft — the same comparison in space, in rent and in rate.
  • Months up to the as-of date count only signed leases; after it, forecasts count too.
  • Switch scenario from the panel and the same months compare against another plan — last year’s budget, or the underwriting you bought the asset on.
Westbridge Tower · FY2026 Budget · 2026
Leased AreaBase RentBase Rent / Sq Ft
BudgetActual / ForecastVariance
Base rent · variance · $000s · actual to Sep 30, forecast after
UnitSepOctNovDec
0301
Northwind Labs
000−18.4
0701
Vacant
−24.0−24.0−24.0−24.0
0804
Cedar & Pine
0000
Property−24.0−24.0−24.0−42.4
Average rate · Sep · budget$33.60 / sfBudget
Average rate · Sep · actual$34.10 / sf+1.5%
Reading it · Sep 2026
The rate is ahead of budget; the space isn’t. Suite 0701 was budgeted to lease up on July 1 and is still empty, and 0301 goes vacant on Dec 1.
Tenancy

The building as it stands — on any date you pick.

Tenancy opens as at the last day of the period you’re reading. The Stacking Plan colours every suite by the year its lease ends, so a heavy expiry year shows up as a band across the floors. Move the as-of date and the Stacking Plan, Unit Listing and Lease Listing move with it. Industrial assets get a Bay Plan instead of floors, and the Leasing tab keeps the period’s leasing figures counted.

  • Stacking Plan, Unit Listing and Lease Listing — the rent roll — at any as-of date, with Export.
  • Base Rent by unit and month, budget against actual, with year to date, the rest of the year and the full year. Unit types such as Office and Retail are subtotalled above the asset total, and the headings and totals stay in view as you scroll.
  • Industrial: a Bay Plan, bay by bay, and Rollover — the largest tenant’s share of rent and area, the weighted average lease term, the next lease to end, and each lease’s rent against the market.
  • Condominiums read as units and owners: Tenancy becomes Units & Owners, with each suite owner-occupied or rented and owners in arrears marked.
Tenancy · as of 2026-09-30
Westbridge Tower · floors 03–08 · coloured by lease end · Export
08
0801 Harbourline Capital0804 Cedar & Pine
07
0701 Vacant · 9,600 sf0708 Harbourline Capital
06
0600 Tidewater Legal
05
0501 Acme Corp0502 Acme Corp
04
0400 Orion Health
03
0301 Northwind Labs0305 Bluebird0310 Orion Health
20262027202820292030+Vacant
Insights AI in occupancy

Ask about the leases behind the number.

Insights AI reads occupancy, leases and expiries alongside the period’s figures, so it can explain a miss down to the suite and tell you what’s coming due. It reads the Tenancy tab and a scenario’s budget against actual and forecast too. The scenarios stay with your team — Insights AI reads the leases and the results, and the assumptions remain yours to set.

  • Misses explained — occupancy against budget, down to the unit.
  • Expiries ahead — who’s due, how much space, which date.
  • The plan, tracked — a scenario’s leased area, base rent and rent per square foot against actual and forecast, month by month.
  • Tenancy, building by building — how many leases each building has, who is in a unit, which leases cover space outside GLA.
  • Your AI, too — the same leasing data over MCP, for Claude, ChatGPT, Copilot and others.
Ask Insights · Westbridge Tower
Why is Westbridge Tower behind on occupancy, and what expires in the next 12 months?
Reading occupancy variance · Westbridge Tower · Sep 2026
Reading expiring leases · Westbridge Tower · next 12 months
Insights AI
Occupancy is 94.2% against a 96.5% budget Occupancy · Sep 30. The 2.3-point gap is suite 0701: 9,600 sq ft budgeted to lease up on July 1, still vacant Unit · 0701. Coming due: Northwind Labs, 0301, 7,000 sq ft on Nov 30 Lease · 0301, and Acme Corp, 0501–0502, 20,000 sq ft on June 30, 2027 Lease · 0501.
Against the FY2026 Budget, how is rent tracking?
Comparing budget with actual · Westbridge Tower · FY2026 Budget · 2026
Insights AI
The rate is ahead: $34.10 a square foot in September against $33.60 budgeted Base Rent / Sq Ft · Sep. The rent isn’t: $24,000 a month behind while 0701 stays empty, widening to $42,375 in December when 0301 goes vacant Base Rent · variance.
Open Occupancy PlanningPropose action

See a scenario recalculate.

A 30-minute walkthrough: the unit-by-unit Gantt, an assumption scenario recalculated, the budget against actual month by month, the gap to fill, and the stacking plan at any date.

Book a demo →